Earthwork continues at Mirror Lake Assisted Living Project. Retaining walls are getting back-fill, prep for curb gutter and ATB driveways. Garage entrance is poured and curb work is in process.
The project includes 69,000 sft of living and support space in two three story structures for a total of 54 units. The assisted living village includes a full commercial kitchen, dining facilities, library, theater, and outdoor walk paths. The buildings will be built on top of a 65 stall, 29,600 sf, concrete parking garage.
We had a chance to fly the drone at the project site end of September: