A 3-level self-storage center with loading dock. The building will include a 12,900 square foot basement, a 5,800 square foot crate warehouse, and will consist of 394 unconditioned spaces and 291 conditioned spaces for a total of 685 storage units.
Construction includes site work, underground utilities, concrete foundations, cast-in-place concrete basement walls, tilt-up concrete wall panels, light gauge framing, pre-engineered building and roof system, doors, elevator, storefront system, mechanical, plumbing, fire sprinkler, and electrical systems.
This project is currently under construction.
U-Haul Moving & Storage of Hazel Dell
Project Size: 60,700 Sq. Ft. Project Address: 8250 Highway 99, Vancouver, WA Architect: AMERCO/AesusDesign Group