New construction of a 3-level building that consisting of 442 self-storage units and a 4,000 square foot crate warehouse with loading dock.
Construction includes sitework, underground utilities, concrete foundations, tilt-up concrete wall panels, CMU walls, light gauge framing, pre-engineered building and roof system, doors, elevator, storefront system, mechanical, plumbing, fire sprinkler, and electrical systems.
This project is currently under construction.
U-Haul Moving & Storage of Bremerton & Gorst
Project Size: 52,000 Sq. Ft.
Project Address: 4107 W State Highway 16, Bremerton, WA
Architect: AMERCO/AesusDesign Group