Michaels of Oregon
Michaels of Oregon, manufacturer of accessories for hunting, shooting sports and law enforcement, approached Petra to build their new 2-story manufacturing facility.
Construction of this 100,000 square foot, tilt-up concrete building, now a UPS Distribution Center, included build-outs of office space, reception area, conference room, and break room, elevator with mezzanine access, 7 dock high and 3 grade level loading doors, HVAC throughout office and warehouse, wet pipe fire protection system, and 230-stall parking lot.
Additionally, Petra self-performed the footings, foundation, slab-on-grade, tilt-up concrete panels, and site concrete for this project.
Project Size: 100,000 Square Feet
Location: Meridian, Idaho
Delivery Method: General Contractor
Category: Office, Industrial, Self-Performed Concrete