Capitol Distributing
The Capitol Distributing warehouse expansion added over 9,000 additional square feet to its distribution center in Meridian, Idaho. The project included earthwork, underground utilities, CMU walls, relocation of existing wall panels, structural steel, doors, hardware, mechanical, fire sprinkler, plumbing, and electrical systems.
The warehouse addition is located in an area of the main facility that has extremely limited access. PETRA was able to construct the addition and perform the work with all of the site constraints and without disrupting Capitol Distributing’s operation in the rest of the facility.
PETRA self-performed the footings, foundations, slab-on-grade, cast-in-place walls, and site concrete for this project.
Size: 9,019 Square Feet
Location: Meridian, Idaho
Delivery Method: General Contractor
Category: Industrial, Self-Performed Concrete
|